Recently completed custom tile shower

Completed tile shower with the clear glass shower door installed
Completed tile shower with the clear glass shower door installed
Existing shower ready for demo
Existing shower ready for demo
After we removed the old tile we discovered mold on top of the shower pan liner
After we removed the old tile we discovered mold on top of the shower pan liner
Framing is complete
Framing is complete
Ready for tile
Ready for tile
A recently completed basement remodel. We painted the ceiling black, new framing, drywall and a laminate floor
A recently completed basement remodel. We painted the ceiling black, new framing, drywall and a laminate floor

We recently completed a custom tile shower. After demo we discovered that the original shower pan system was installed incorrectly. After 12 years the shower liner failed resulting in a rotten subfloor, rotten framing, mold and even mushrooms. Landmark Contractors removed all the tile, rotten framing and even the mushrooms. We installed new sub flooring and framing including a custom niche. We took the extra time that is necessary to install a shower floor pan system. We installed a new Delta shower valve, and then tiled the floor, walls and installed a shower door.

Comments (0)